Construction Claims
John Jurewicz reports on the technical challenges with and his experiences relating to tests for uploading multiple models with Web services.
Tammy McCuen's article presents the collaborative effort between professional estimating associations to develop the Information Delivery Manual (IDM), defining the information exchange about a facility from the design model to the cost estimator.
The U.S. Army Corps of Engineers (USACE), which has 45 districts worldwide, has big plans for its building information infrastructure. In a recent webinar sponsored by Construction Project Controls and BIM Report, USACE's David Rackmales reported that his agency will pursue, "aggressively," adoption of the Construction Operations Building Information Exchange and sign an enterprise license agreement with AutoDesk. Additional details about these efforts are included in this edition of CPC/BIM.
This is the first of a three-part series of articles covering various methods with which building information models may be used in a collaborative project.
Exhibits addressing building information modeling, other areas round out the latest edition of the Design-Build Institute of America's contract documents.
After reviewing the major differences between Revit 2010 and the new version, does Jurewicz recommend upgrading?