Skip to content

Past event

BIM Collaborative Interest Group Meeting No 3 (London)

We are keen to meet and discuss Building Information Modeling (BIM) with members of our community, and that includes all planners. This will be is our 3rd meeting for this Guild Interest Group within the Guild and we will take a look at some case studies where the planning engineering and project co

Starts

We are keen to meet and discuss Building Information Modeling (BIM) with members of our community, and that includes all planners. This will be is our 3rd meeting for this Guild Interest Group within the Guild and we will take a look at some case studies where the planning engineering and project control function was entwined with BIM.

 
We are again arranging for some key people within the industry that will help us in our endeavour to understand BIM in order for us to be the Masters of the advancement of BIM in our professional roles as Project Planning, Project Controls and Delivery people.
  • Venue: The Victoria, Strathearn Place, Lancaster Gate, London, W2 2NH
  • Time: 4pm - 6pm
  • Max Attendees: to be advised
  • Agenda

Carl Collins from the London Revit User Group*  (http://www.lrug.org.uk/) will be presenting a BIM session for the GPPCD – Collaborative BIM Group. Carl is a CAD Manager for Arup Associates, the Unified Design Studio of Arup, and has a wealth of experience in Building Information Modelling.

  • The topic for discussion is:
  1. Introduction to the London Revit User Group.
  2. What BIM means to Designers.
  3. Quick fly-through of sample presentations that LRUG have had over the past year.
  4. Q&A on how Designers can model for Construction Planners & Schedulers using 4D BIM technologies

Free Beer provided to attendees between 4 - 6pm.  To reserve a place, please login and use the SIGN-UP link above.

 

Published 29 May 2011 by admin

Comments

No comments yet.

Log in or join to comment