Asta - Draw curve if vertical
In the Open Standard
Mike plannerMember for 15 years 8 months
- Created
- 1
- 4
0
Hello All,
Hope you all had a great and rested weekend. A programme has been set to draw curve if vertical by default so everytime i draw a link between 2 tasks, the link will become curve automatically if its vertical.
Can i know how do i reset it to straight link by default?
P.S I can set the links to straight link manually after i drew a curved link but that would be a bit waste of time. I want a straight link by default.
Many thanks
Mike Planner
1 reply