just read an article of 10D BIM - are these stages internationally recognised?

2 replies

Oldest first
  1. 0
    Patrick Weaver ·

    Last time I looked Peter the

    Last time I looked Peter the international consensus fails after the first 5:

    3D physical dimensions

    4D Time

    5D Cost (even this is variable)

    There needs to be a prpoper standard!  A 7-D model is at: https://mosaicprojects.com.au/PMKI-ITC-011.php#BIM

  2. 0
    Bhavinbhai Lakhani ·

    Hello Peter,The concept of

    Hello Peter,

    The concept of "10D BIM" refers to an advanced level of Building Information Modeling (BIM) that extends beyond the traditional 3D model (geometry) and includes additional dimensions that represent various aspects of a construction project. While the specific stages of BIM (such as 3D, 4D, 5D, etc.) are generally recognized and standardized internationally, the term "10D BIM" itself may not be universally recognized or standardized in the same way.

     

    Thanks,