Survey: Time Schedule updates - Time Schedule Tool or 4D BIM integrator tool?
In the Open Standard
António FariaMember for 17 years 9 months
- Created
- 5
- 3
0
Hi,
After importing a time schedule to a BIM tool (such as Navisworks or Synchro) to produce a 4D BIM project, :
a) do you perform all the time schedule updates (follow-up) in the BIM tool exclusively? or
b) do you perform all the time schedule updates (follow-up) in the time schedule tool (Microsoft Project or Oracle Primavera) and afterwards you import again the time schedule to the BIM tool (2 steps update)?
All your opinions or experience are welcome.
Thanks