How to cast a column in top down construction?

Liang Ching LeeMember for 12 years 7 months
Created
1
3
0

Hi,

Anybody can tell me how to cast a column in top down construction after the higher floor slab casted?

Thanks.

1 reply

Oldest first
  1. 0
    Anoon Iimos ·

    simply the same as in bottom

    simply the same as in bottom up; can you reverse gravity?

Log in or join to reply