Re-using VBA code in Primavera SureTrak
In the Open Standard
David KerseyMember for 19 years 5 months
- Created
- 1
- 3
0
I had posted this to the Primavera Project PlannerP3 forum; it was suggested that I should try re-posting here.
I have created macros in Microsoft Project 2003 and 2007 using their VBA programming language. I have been considering using a Primavera product such as SureTrak which I am told creates macros in SBL(Softbridge BASIC Language).
I would like to hear any users’ comments on the re-usability of the VBA code in a SureTrak Macro.
I am sure that the object classes and their properties and methods would differ from application to application and would have to be altered. I would like to know if the VBA programming logic that performs calculations, reads from and saves to text or binary files created in a Visual Basic program, etc. is re-usable.
Regards
David
I have created macros in Microsoft Project 2003 and 2007 using their VBA programming language. I have been considering using a Primavera product such as SureTrak which I am told creates macros in SBL(Softbridge BASIC Language).
I would like to hear any users’ comments on the re-usability of the VBA code in a SureTrak Macro.
I am sure that the object classes and their properties and methods would differ from application to application and would have to be altered. I would like to know if the VBA programming logic that performs calculations, reads from and saves to text or binary files created in a Visual Basic program, etc. is re-usable.
Regards
David
1 reply
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?