Looping backwards through a 'For Each' collection
In the Open Standard
John BortonMember for 8 years 1 month
- Created
- 6
- 3
0
Here is the usual VBA code for looping through all tasks in a project:
For Each t In ActiveProject.Task
{code for desired action}
Next t
This loops through from the top down (as far as I can tell).
Anyone have an ideas as to how I can reverse this and go from the bottom up?
Thanks
JB