Ribbon size
- Created
- 2
- 3
Hello PPlanners,
I know my question will look strange to most of you;
is there a way in MSP 2016 to fix or freeze the height of the ribbon?
What I mean is: in MSP the ribbon normally is of the same height as in MX Excel or Word, somewhere under 2 inches on my screen; and, all of a sudden, the height increases dramatically, to more than 2 inches
if I collapse the ribbon, and display the ribbon by selecting one tab or the other, the ribbon displays at its normal height.
I cannot say where this behaviour comes from; maybe something in the registry?
Thank you for your help,
Alexandre
2 replies
Oldest firstLog in or join to reply