database ’PMDB10’ is full. Error code PRMDB-2035-6

A DMember for 19 years 5 months
Created
3
2
0
While working on P6, following error code pop on screen.

PRMDB-2035-6: PRM DBAccess Error: Database Server Error: The log file for database ’PMDB10’ is full. Back up the transaction log for the database to free up some log space.

What does that mean. I hav asked tat on POINT, but it may take few days to get reply from them.

help plz

3 replies

Oldest first
  1. 0
    Dieter Wambach ·
    Raviraj
    This is an item for your Database Admin. All db systems have a log-file to do a rollback (into a certain stable status) in case of crash or other difficulties or simply an "undo".
    "Full" in general can have those reasons:
    1. Server run too long time without stop and restart (MS SQL Server)
    2. Technical problems e.g. network not stable --> many retries or a technical equipment within the network damaged
    3. Wrong parametrization of the database
    4. If you have an interface to e.g. SAP: program error.

    P6 shouldn’t be the reason.

    Good luck!
    Dieter
  2. 0
    A D ·
    Thanks Dieter,

    I thought it’s a error from my side. But, apparently, Admin has completed the required things.

    Thnaks Neway, for the help

    Cheers,
  3. 0
    A D ·
    There’s a primavera bulletin on this

    Check solution No. 200363104250

    U need to shrink the log file

    Cheers,