Can I install P6 Stand-alone in Win & OS?

Nigel BurnMember for 19 years 2 months
Created
2
2
0
Hi all,
Is it possible to load P6 stand-alone into the Win 7 OS?
Does anybody have the installation steps, or is it the same steps as loading into XP?
What additional products have to be loaded?(Updated SQL Server?, etc)

Any help will be appreciated.

Regards.

2 replies

Oldest first
  1. 0
    David Kelly ·
    I did have some issues installing standalone P6 v7.0 on Windows 7. BUT when the Oracle Technician phoned me back - it all installed properly with him watching. The steps are just the same as XP.
  2. 0
    Jijo George ·

    hi i was using p6 in windows

    hi 

    i was using p6 in windows 8. now i upgraded to windows 10 but p6 is not working. any help? i uninstalled and installed again. but i cant configure data base. anyone can help???

     

    thanks 

     

    jijo