Error on P6 installation
In the Open Standard
SH
Shah. HBMember for 17 years 10 months
- Created
- 8
- 6
0
8 replies
Oldest first- 0JLJohn Lawson ·Hi Shahul,
A lot depeds on what type of a P6 installation are you trying to make.
If its a standalone Windows XP installation you could try the following - (have recently carried out this on my Standalone P6.2.1 installation and it worked!!!!):
1) Make Sure you have completly removed P6 from your Program Files. (Use the Primavera Disks to remove & then remove the folder / sub folders for Primavera.
2) Find and remove all traces of SQL Server 2005 - files and folders. (use Windows - Control Pannel - Add/Remove)
3) Make sure you have IIS (Microsoft Internet Information Services) loaded on your PC - if not down load it from your XP system disks. (Use Windows - Control Pannel - Add/Remove)
4) Make sure you are using MSXML version 6 - if you have a higher version i.e. 6.2 delete it, do this by down loading a file from Windows called "Installer Clean Up from Microsoft". Don’t worry about installing MSXML - this will be done when you run the setup from Primavera.(MSXML is used to install the SQL Database Engine - that runs Primavera).
5) Try running the Primavera disks now - however you will need your License file and Product Code ready to install when requested.
6) If it runs, the system may not work. It may not bring over "SLQ Server Management Studio Express" - This can be down loaded from Microsoft (2005 version) - and installed.
7) Now remove P6 again - use the Primavera Disks - but do not touch the SLQ files.
8) Now reload the P6 - you will have to config the databases - i.e. PMDB & MMDB - pubuser and with a password pubuser.
9) Best of luck.
Regards
John - 0JLJohn Lawson ·Hi Shahul,
Sounds like yout operating system has a problem that needs to be sorted i.e. reload etc.
- I run a Standalone System on Windows XP Professional with Service Pack 3 installed, works a treat.
- I beleive it can also run on Vista Business Edition with Service Pack 1 installed.
- Not sure about running on Windows 7 - but Jay has achieved it - so perhaps the way to go - (well done Jay).
- Have you checked the P6 Tested Configurations against what your PC is running on. This pdf can be downloaded from the Oracle E-Delivery system
i.e. http:/edelivery.oracle.com/EPD/Download/get-form ,
or should be on one of your disks (try under Documentation).
- Also check what version of Internet Explore are you using
It should work - so easy to load up etc.
Regards
John
- 0RDRafael Davila ·Shahul,
Perhaps you are having issues because you did not completely uninstalled SQL Server Management Studio as per JL post #3, recommendation no 2 “Find and remove all traces of SQL Server 2005 - files and folders. (use Windows - Control Panel - Add/Remove)”
First of all remember to backup your files to a separate hard disk, messing with the registry and operating system is risky. Recommend a full backup as some programs store data files in folders other than My Documents, otherwise you might end up losing your most valuable data.
You can use these docs for uninstalling your 2005 sql instance based on your requirement.
Uninstalling an instance of SQL Server 2005 manually
http://support.microsoft.com/?kbid=909967
Windows Installer Clean-Up Tool
http://download.microsoft.com/download/E/9/D/E9D80355-7AB4-45B8-80E8-983A48D5E1BD/msicuu2.exe
Uninstall SQL Server Management Studio
http://support.microsoft.com/default.aspx?scid=kb;EN-US;909953
Using the Add or Remove Programs item in Control Panel to add or remove components for stand-alone installations and clustered installations of SQL Server 2005 (KB: 922670)
http://support.microsoft.com/default.aspx?scid=kb;EN-US;922670
Uninstall SQL Server Express
http://msdn2.microsoft.com/en-us/library/ms143505.aspx
Fatal error during installation
http://support.microsoft.com/?kbid=919945
Uninstall Applications NOT in Install/Remove Programs List
http://blogs.msdn.com/astebner/archive/2005/10/30/487096.aspx