LOG ON PROBLEM WITH PMSDK IN P6 V.7...

Jeoffrey ReyesMember for 18 years 3 months
Created
6
2
0
Hello Guys,

Can someone help me to connect to database. I am using P6 V.7 on windows 7. The ORAPMDB is working but others not like, PMDB, MMDB & PMSDK. I tried to log on to PMSDK but error shows like this..."Bad public user name or password. Database Server Error: SQL Network Interfaces: Error Locating Server/Instance Specified [xFFFFFFFF]. ;

I setup already my ODBC and it is working. Maybe there’s something missing or wrong on my setup?

Hoping for your response and thanks in advance.


Cheers,

Dyep

6 replies

Oldest first
  1. 0
    Rodel Marasigan ·
    Jeff,

    I believed that the database is using oracle and not SQL. PMDB normally used by SQL as default but IT or Admin who installed Primavera database can change it to different name. Try to configure your SDK to Oracle instead of SQL and it should work.
  2. 0
    Jeoffrey Reyes ·
    Rodel,

    P6 v.7 was installed on my laptop. can you give me steps how to change setup from SQL to Oracle?

    thanks and regards,



    Jeff
  3. 0
    Rodel Marasigan ·
    Jeff,
    Who installed P6v7 on your laptop? You need to un-installed the Oracle database and Oracle Server first before you can install SQL Server and SQL database or vise versa.
  4. 0
    Jeoffrey Reyes ·
    Rodel,

    I did. After that will it work already or do i have any settings to be done?


    regards,

    Jeff
  5. 0
    Rodel Marasigan ·
    Jeff,
    Did you install SDK also? If yes try to use it if working or not.

    Note: SDK should be configuring the same as database. If oracle then configure using Oracle driver and if SQL then SDK should be configure using SQL driver.
  6. 0
    Jeoffrey Reyes ·
    Rodel,

    Ok, I’ll try it first then i’ll come back to you later. Thanks a lot.


    regards,

    Jef

Log in or join to reply