Showing Two Critical Paths in P6
In the Open Standard
Ijaz AhmadMember for 20 years 3 months
- Created
- 7
- 4
0
Hello Guys,
I am having problem to show two different critical paths in the same schedule at the same time. One path has Total Float = 0 and the other path has Total Float = 112. The problem is when I set the option "Total Float less than or equal to" to 112, those activities that fall in the range 0 to 112 also show up as critical. Is there a way that my one path shows only those activities which have zero total float and the other path that has total folat 112 only.
Any help will be highly appreciated.
Thanks
Ijaz
I am having problem to show two different critical paths in the same schedule at the same time. One path has Total Float = 0 and the other path has Total Float = 112. The problem is when I set the option "Total Float less than or equal to" to 112, those activities that fall in the range 0 to 112 also show up as critical. Is there a way that my one path shows only those activities which have zero total float and the other path that has total folat 112 only.
Any help will be highly appreciated.
Thanks
Ijaz
7 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?