Running SQL 2005 database and Primavera P6 on Laptop with Windows 7
In the Open Standard
Amir PezeshkMember for 14 years 10 months
- Created
- 1
- 2
0
Hi,
I have both SQL and the P6 installed on one computer. But it seems that the database gets corrupted and it is not letting me to log in to the application or the database. Does anyone have any idea of having these two installed on one laptop will cause any problem? This is the error i get.
Exception EAccessViolation in module PM.exe at 0043bfbf.
Access violation at address 0083bfbf in module pm.exe
1 reply