Information required on the Spanish Version of P6 V8.2 for book translation

Paul HarrisMember for 25 years 6 months
Created
0
4
0

I am currently translating my P6 V8.2 book into Spanish (South American).

At the moment we are using the P6 Version that I have dowloaded in Australia from the Oracle US web site.

When we select Spanish language in P6 there are many things in the sample P6 database that are in English such as the sample Project Names, Activity Names, Calendar Names, Baseline types etc that are not translated by changing the language.

I would like to know from someone who has used P6 V8.2 that was downloaded and installed in South America to understand if the version that is installed in South America with the Primavera sample database has English terms or is it installed with a Spanish language database?

Regards

Paul E Harris
Managing Director and President, Eastwood Harris Pty Ltd
www.eh.com.au

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply