P6 Print function turned off?
In the Open Standard
Bishop OConnellMember for 19 years 11 months
- Created
- 2
- 3
0
I'm using P6 version 6.2.1 and I'm encountering something I've never seen before. The print, print preview, and page setup functions are all grayed out. I suspect this is a user rights issue, though I've looked and can't see anything obvious. I don't have admin rights to modify it, or to experiment. A search of the forum, and of google, came up dry. Anyone ever run into this before? Aside from user rights, my only other thought is a program error, but as I said I've never seen this before.
Thoughts? Thanks in advance.