P6 8.3 Install problem

Lincoln NgindiMember for 14 years 6 months
Created
1
4
0

I am having problems intalling P6 on my machine. The following message is popping up:

''Primavera P6 Professional R8.3.2 setup Wizard ended prematurely because of an error. Your system has not been modified. To install the program at a later time, run Setup Wizard again. Click Finish button to exit the Setup Wizard''.

I have tried several times and this keeps on happening.

How can this be rectified?

Lincoln

1 reply

Oldest first
  1. 0
    Santosh Bhat ·

    Are you running the installer

    Are you running the installer as an administrator in Windows?

Log in or join to reply