Contractor is submitting baseline with settings at "Calc Mult. Float Paths" using "Free Float"
In the Open Standard
John ReevesMember for 13 years 5 months
- Created
- 4
- 4
0
Contractor is submitting baseline with settings at "Calc Mult. Float Paths" using "Free Float" - would this do anything at all to change float values? what would this do to the schedule? should they be required to remove it? (Personally I like to use the float path calc for a report, but I always put it back/remove it.)