Skip to content

Primavera overview training

James ShimmonMember for 13 years 7 months
Created
1
2
0

Morning all,

 

I've been asked to produce a training package for non-users of P6 to give them an overview of the system and how its used.

I was going along the lines of introducing the basic planning principles then moving onto the system, showing various layouts, reports etc.

If anyone has any other good ideas or better still, a presentation or package that they've already developed then i would love to talk to you.


Cheers

Shimmo

1 reply

Oldest first
  1. 0
    Paul Harris ·

    ShimmoI have produced a range

    Shimmo

    I have produced a range of training materials that include PowerPoint presentations and student handouts that you may tailor to meet your requirement.

    I have produced "Principles of Planning for Building and Construction" which is a one day course for people before they take a P6 or Microsoft Project course.

    I have several P6 courses for all the different versions of P6. 

    Details are on my website and I am more than happy to discuss your specific requirements.

    Regards

    Paul E Harris|
    BSc Hons, Certified Cost Engineer, PRINCE2 Practitioner
    Managing Director and President
    Eastwood Harris Pty Ltd, Australia
    www.eh.com.au,  www.eastwoodharris.com, www.primaskills.com.au  and www.primavera.com.au
    Project Control Consultants and Planning and scheduling software book and training material publishers

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?