Hello,
I want to know where in the P6 Professioanl v24.12 file structure to find the P6 XER to SDEF format conversion program, XERP330Convert.exe, so I can write an article to help direct others in converting XER files to SDEF format.
So far, I have been unable to locate this exe file in P6 Prof v24.12 file structure.
Does Oracle still support this Converter program?
I thought the United States Army Corps of Engineers (USACE) would have this exe available for download as they require schedule submissions to be in SDEF format. However, they do not have this P6 XER to SDEF format Converter program on their site for download.
Is there any other credible site where one can safely download the XERP330Convert.exe?
--Steve