Excel Histograms

Alex CostarasMember for 21 years 4 months
Created
4
2
0
I having a major headache trying to produce a histogram with excel version 2003. I’ve got two columns of figures 1st column are dates (01-mmm-yy) second column is the histogram value. When using the wizard, the generated histogram (Column clustered) has no width. It is just a pencil line in thickness. Changing the overlap and Gapwidth under format data series; options has no impact the column always remains pencil line thick. Anyone got any ideas. Is there a known bug with this version of Excel?

4 replies

Oldest first
  1. 0
    Razi Khan ·
    Hi Alex

    Please check the following steps

    Format Axis(Months)>Scale
    Make Minor Unit = Months

    Hope this will solve your problem.

    Cheers
  2. 0
    Sukumaran Subaramaniyan ·
    Hi,

    Check the following items:
    1)X axis scale
    2)Font size
    3)Text alignment
    Upon the above changes increase the chart area size. This will increase the histogram width.

    Regards.
  3. 0
    Sukumaran Subaramaniyan ·
    Hi Razi,

    Look like we sent the thread almost at the same time.

    Cheers!!!
  4. 0
    Alex Costaras ·
    Thanks Razi that did the trick

Log in or join to reply