As someone who is relatively new to planning, could anyone enlighten me as to what a typical working day in the life of a planner would entail (comical anecdotes welcome!)?
Obviously planning planet may have a small part to play for some people, but only during lunch hours i am sure........
Thanks in advance
Obviously planning planet may have a small part to play for some people, but only during lunch hours i am sure........
Thanks in advance
22 replies
Oldest first- 0OMOliver Melling ·Luke,
Normally start off by logging on an opening email inbox.
Usually have several PPlanet posts in there, one or two about solving real problems people have with planning issues, and a few written by a guy called Charlie who rants about imperialistic native born English speaking planners.
Do a bit o planning..........
At around 10 o’clock Brad Lord usually posts about the wonders of being a contractor, gives me a bit of abuse, then disapears.
Do a bit o planning..........
When dinner time arrives Gwen Blair makes witty remarks on a few threads, which is usually the time Clive Randell appears on the scene and tries to romance her with some poetic planning procedures.
Do a bit o planning..........
Mid-afternoon, an agent calls asking you if you want a job at the place you already work at but on more money. You tell him that you already work there, they hangup.
Do a bit o planning..........
Go home. - 0JGJames Griffiths ·Oliver,
You’re quite right in that "working the plan" is driving discipline behind achieving the primary objective (whatever that may be). Unfortunately there is a continually changing workscope (precluding the kids from beating-the-hell out of each other, constant additional energy infusions, avoidance of asset destruction etc). All these are randomly occuring activities that, although have a statistical probablity of occurence, have an unknown duration. This induces a scope variation that diverts the primary resource from the baseline activities - thus inducing a further reduction in the SPI and CPI values.
With regard to the overspend on the sub-primary resource: Yes, I have considered outsourcing certain elements of the main contract. Unfortunately, running two such activities in parallel tends to cause a further overspend as well as additional physical exhaustion. However, should one consider terminating the main contract, the overall Exit Cost is likely to exceed the existing baseline value + forecast overspend. Tis probably better to attempt to impose a cost-control system that applies significant constraints on the expenditure portfolio.
James. - 0UDUmerfarook Deshmukh ·Hired as planning Engineer
Working as project coordinator
Reach office at 9:00AM
Go through tons of emails in inbox....forwards are most attractive...but read them last
Have a sandwich and coffee
Call Girlfreind
Have a walk on the work floor, give some instructions
Oh my goodness its Lunch time...the one awaited
Reply some mails
Go thru schedule for 5 minutes
Go to floor for follow up for 5 minutes
Call Girlfreind
Have Coffee
Write mails
Shutdown Computer.....Day is over
- 0JGJames Griffiths ·I appreciate your sentiments, Bill - and yes, if I thought for a moment that he was being serious, then I’d be the first to gaze at him in a mode of incredulity. Maybe he is - but we’ll never be able to prove it - so it’s up to us as to how we interpret such postings.
Cheers.
James. - 0UDUmerfarook Deshmukh ·Bill & James,
No management would give fat pay unless untill you have something in you. Also to grow up you need to work Hard......and like you I also want to grow up up and up and to acheive the peak I also work hard.
I have given so many points in my earlier post. Some might have triggered to your interpretation in the other way....I will never blame you for that.....I believe planning is regular time job but coordination of project & planning is regular time + overtime job and right now I am into it and the difference is that coordination can not be measured and people from other side think that your doing nothing. But as always grass is always greener on other side.
Cheers.....No complains
- 0MBMarc Borburgh ·"With regard to the overspend on the sub-primary resource: Yes, I have considered outsourcing certain elements of the main contract. Unfortunately, running two such activities in parallel tends to cause a further overspend as well as additional physical exhaustion. However, should one consider terminating the main contract, the overall Exit Cost is likely to exceed the existing baseline value + forecast overspend. Tis probably better to attempt to impose a cost-control system that applies significant constraints on the expenditure portfolio."
No insurance for that :(
:D - 0AMArmando Moriles ·It’s a holiday here in the Philippines tomorrow 12 October 07 in observance of the Feast of Ramadan (Eid;l Fitr)...
So, Happy Holiday to all Muslim members of PP!!!
Resume work on Monday...And again A Day in the Life of Planner... THINK PLAN CREATE!!!
Best regards to all!
Arman
Log in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?