Suretrack Resource tabulation
In the Open Standard
Ferdinand AnchetaMember for 18 years 11 months
- Created
- 0
- 5
0
Can you please advise how to download a resource table from Suretrack to Excel file. Actually, the resource table (i.e. budget / EV / Forecast) can be shown thru print preview or by printing. Thus, to extract the values (say per week)i need to print and manually entered in my excel table which is a time consuming. Is there other way to download the table in suretrack and export/copy directly to excel file? Am not using P3 or P5, thus, we are in Suretrack system only.