Estimated duration - Permits in Saudi Arabia
In the Open Standard
Carmen ArapeMember for 22 years 3 months
- Created
- 5
- 2
0
Planners (in Saudi Arabia)
For a project to be located in Al-Jubail Saudi Arabia, I would like to know some information associated to permits.
Some key information would be:
Type of Plant: Chemicals
Permits needed: Normally two KEY permits are needed: environmental and construction.
Key documents needed: Plant Layout, Basic Engineering Design (after pre-feasibility study), process description, process flow diagram.
I would like to know;
Duration of the whole process of getting the permit with local authorities.
Most important/Key documents needed in order to start the process.
Cheers,
For a project to be located in Al-Jubail Saudi Arabia, I would like to know some information associated to permits.
Some key information would be:
Type of Plant: Chemicals
Permits needed: Normally two KEY permits are needed: environmental and construction.
Key documents needed: Plant Layout, Basic Engineering Design (after pre-feasibility study), process description, process flow diagram.
I would like to know;
Duration of the whole process of getting the permit with local authorities.
Most important/Key documents needed in order to start the process.
Cheers,
5 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?