High Level Schedule- Airport
In the Open Standard
Civilila 77Member for 17 years 9 months
- Created
- 30
- 11
0
Hi ALL,
Im putting together an Overall High Level Schedule for an airport terminal based on sqm areas (the only available info at the moment) for following Structures:
1. Duty Free Warehouse: 18’000 m2
2. Fire Training Facility: 8’500 m2
3. Passenger Rail System- Station Box: 300m (L)* 40m (W)*20m (D)
4. Fitting out of lounges in the Passenger Terminal: 40’000 m2
Anyone there with such experince who can help?!!Plssssssss:d
cheers