Steam Turbine

Sebouh PamoukianMember for 17 years 8 months
Created
3
2
0
Hello there,

I need to have a sample steam turbine (combined cycle) Power Plant schedule. activities and sequence of work.

If anyone could send me a P3/P5/P6 or even PDF version, I would be much grateful.

Thank you in advance

e-mail: sebouhp@hotmail.com

3 replies

Oldest first
  1. 0
    David Wallace ·
    Sebouh,

    Please post once. You have posted this in three different forums.

    This is the most suitable forum, so I will lock the other two.

    David.
  2. 0
    Christian Martinek ·
    Hi Sebouh

    I have a project plan for steam turbines.
    First I need you to inform me of the following:

    - Type of machine eg. MAN, AEG etc.
    - Do you only need for the actual turbine section or for the auxiliaries as well? (steam piping, jacking oil, relay oil etc.)
    - Does the machine only have LP and HP or more turbines?
    - What format would you prefer?
    - Please note that every project has different deliverables and different scope of work, but I can assist you as far as possible.

  3. 0
    Sebouh Pamoukian ·
    Hi Christian,

    My project incudes steam turbines from GE and HRSG of vertical type from Doosan.
    I need a schedule of all workpackages, steam turbine, HRSG, and auxiliaries.
    The machine has LP and HP/IP.
    I would prefer it on P3 format (zipped or PRX) but in case you have it in P5 or P6 originally, I rather have the original P5/P6 version in order not to lose information (XER).

    Christian, even if your schedule doesn’t comply with my project’s requirements, please send it to me anyway. It will give me an idea. Whatever you have will be helpful.

    Thanks a lot.

Log in or join to reply