The 3D Gantt explained in video

Jean-Yves MoineMember for 17 years 9 months
Created
2
4
0

 

The 3D Gantt resulting from the the 3D WBS method allows to identify project interfaces (co-activity, physical, temporal). It is at the same time a time-location diagram.

http://3d-wbs.blogspot.fr/2013/03/part-76-3d-gantt-explained-in-video.html

BR, Jean-Yves Moine

2 replies

Oldest first
  1. 0
    Patrick Weaver ·

    Given the historical fact

     

    Given the historical fact that Henry Gantt did not invent or even like barcharts there pre-dated his work by at least 100 years the whole concept is off to a very bad start – Gantt’s charts were sophisticated production control tools for manufacturing facilities.

    Anyone still thinking Gantt invented or used bar charts needs to get up to date and read the materials at: http://www.mosaicprojects.com.au/Resources_Papers_158.html which includes his books and details of his important work as a management consultant. 

    Perhaps if people actually called their new charts something accurate they may be taken more seriously.

  2. 0
    Jean-Yves Moine ·

    All the characterics of

    All the characterics of classical Gantt diagram are taken in charge with what I called the "3D Gantt diagram", simply because anyone know what is a Gantt barchart, and it is almost the same in 3 dimensions. But the 3D Gantt is more powerfull than the classical Gantt, simply because you can identify graphically all the project interfaces as a time location diagram for co-activity interfaces, but, with 3D Gantt you can also identify physical and temporal interfaces.

    In a classical Gantt diagram, logical links are supperposed, so you can't see it, whereas with 3D Gantt you can.

    BR, Jean-Yves Moine