Design Deliverables & Dependency Matrix
In the Open Standard
Paul DoranMember for 15 years 2 months
- Created
- 0
- 2
0
Hi All,
I'm trying to put together a matrix that I can then mirror the logic for in P6, regarding design documentation and deliverables in the water industry, for example:
Telemetry schedule to FDS, FDS included
EICA Spec allows enquiries to go out to the Elec and ICA Suppliers
Other docs include: Control Philosophy, P&IDs, instrument schedules etc.
If anyone already has a matrix / flowchart, or can point me in the direction of any info it would be appreciated.