As-built Time-Chainage Chart
In the Open Standard
Abdulrahman SaadiMember for 11 years 6 months
- Created
- 6
- 31
0
Dear all,
I need urgent help to draft a chart demonstrating type of work (with diferrent color) over the chainage of the road (x axis), and time (y axis).
Basis data is construction log that contains in columns those information: Date, from chainage, to chainage and type of work.
The chart should look like Horizontal lines with different colors on different levels in accordance with the date axis.