TOTAL Float
In the Open Standard
Forum GuestMember for 17 years 8 months
- Created
- 4
- 1
0
Can somebody help me in answering me the following question in seriatim on priority ?
a) Does Total Float means the Completion Date of Project?
b) For a CPM schedule, will the total float of all activities be zero. If not will we have to make zero float of all activities?
c) Front loaded and Back Loaded Curve is used for which type of resources?
d) Why do we need the Backward Pass and Forward Pass in scheduling? Illustrate Backward and Forward Pass calculation by a simple example?
e) While giving 100% progress why does the bar become invisible in P3?
Regards
a) Does Total Float means the Completion Date of Project?
b) For a CPM schedule, will the total float of all activities be zero. If not will we have to make zero float of all activities?
c) Front loaded and Back Loaded Curve is used for which type of resources?
d) Why do we need the Backward Pass and Forward Pass in scheduling? Illustrate Backward and Forward Pass calculation by a simple example?
e) While giving 100% progress why does the bar become invisible in P3?
Regards
4 replies
Oldest firstLog in or join to reply