P3E in Powerpoint
In the Open Standard
Forum GuestMember for 17 years 8 months
- Created
- 3
- 4
0
Hi,
I’m sure that most of you, or at least most of your bosses, at some time or another must have to present a schedule in meetings. In order to do this I have been trying to get something reasonable out of P3E/c that can be put into powerpoint and subsequently shown on a slideshow on a projector. Does anybody have a good way of doing this? So far I have tried PDF’s, but it seems difficult to get a clear image without a sort of blurring effect.
Thanks
I’m sure that most of you, or at least most of your bosses, at some time or another must have to present a schedule in meetings. In order to do this I have been trying to get something reasonable out of P3E/c that can be put into powerpoint and subsequently shown on a slideshow on a projector. Does anybody have a good way of doing this? So far I have tried PDF’s, but it seems difficult to get a clear image without a sort of blurring effect.
Thanks
3 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?