P3 wont run
In the Open Standard
RN
Ray NotleyMember for 23 years 8 months
- Created
- 36
- 2
0
When trying to run my P3 (which was running fine up until 2 days ago) , I get the following message "c:winntsystem32autoexec.nt The system file is not suitable for running MS-Dos and Microsoft Windows applications".
Can anyone tell me the fix for this ?
Can anyone tell me the fix for this ?
36 replies
Oldest first- 0PMPaul Maddocks ·
To establish exactly which files may be missing or corrupted, do a search for the 3 files in the system32 folder. If any of the files cannot be found you will need to reinstall them from either your OS Installation disk or a folder on your system_root called i386.
To resolve this issue, type the following commands at a command prompt to expand the Autoexec.nt, Command.com, and Config.nt files from the Windows XP installation CD-ROM to the WindowsSystem32 or WinntSystem32 folder. Press ENTER after you type each command. When you type these commands, replace cd-rom with the letter for your CD-ROM drive, drive_letter with the drive letter for your system partition, and system_root with the name of your Windows XP folder (this is typically either Winnt or Windows). After you type these commands, restart your computer:
expand cd-rom:i386config.nt_ drive_letter:system_rootsystem32config.nt
Do this for any of the 3 files not found in your search.
The "expand" command is used to decompress the files to their original format.
The above files are utilised for running 16 bit applications in a virtual Windows environment.
Hope this clarifies the reinstallation process.
Good Luck
Paul
- 0TGTom Graham ·Fellow Planners,
I’ve just installed P3 V3.1 on a machine running Windows XP SP1. This worked fine initially, but now when I attempt to start P3 I get the error message ’A Serial Number Could Not Be Locked’.
The only thing that has been done to the machine between P3 working and not working, is that I installed the Pervasive 32 bit ODBC drivers.
I’ve heard of this problem before and thought the answer was to enter the task manager, kill some processes (wowexec.exe was one I think...) and restart, but I’m struggling to turn this theory into practice.
If anyone knows the solution to this, your help would be greatly appreciated. - 0DDDayanidhi Dhandapany ·Hello Tom,
Uninstall the Prevasive Driver which you have installed first then there will not be a problem to open p3 application, it will work normaly.
If you want to reinstall the driver follow these steps:
During re-installation of ODBC, you have to answer a few things,
Q1: Would you like to be use ODBC interface as a client for a remote scalable SQL or Btrieve server engine? Yes or No(buttons will be there)
A1: Default answer is yes, but you have to click "no" button
Q2: Would you like to be use ODBC interface as a client for a local scalable SQL or Btrieve server engine? Yes or No(buttons will be there)
A2: Default answer is yes, you have to click "no" button
Q3: Would you like to run ODBC interface using local pervasive software 32 bit Btrieve Workstation engine? Yes or No
A3: you have to click "yes" button
Then the further questions which appear on the computer screen is not so troublesome to follow.......
I hope the above will help you.
Cheers
Daya - 0AFAlexandre Faulx-Briole ·Hi there,
I have been running P3.1 V1 on a Windows XP Pro SP1 machine for months, and suddenly P3 does not run and I get several error messages lasting with the following one:
"A Serial Number Could Not Be Locked"
I have uninstalled the software and tried to reinstall it and the message is now:
"BTREGSET.EXE cannot initialize correctly" (translated from the french).
P3 installs and launches well on another Windows 98SE machine.
Any idea?
P3 was working well a week ago,before I put Skype.com on my PC.
Alexandre - 0MTMk Tse ·There is at least 2 possibilities: -
1. Please check the Btrieve data engine version.
2. Some software will remove some Window system files when installation. You need to find out which system files is deleted and put back in. (I have this experience when installing Pervasive SQL, 6 Window system files deleted on win95 and 10 will be removed on winXP) - 0AWAndy Willard ·Try this solution - from the Primavera Website:
Solution ID: 200292316242
Solution 3
Some files are "locked" on the computer due to the abnormal termination of P3. To reopen P3, these files must be closed.
On WIN95/98:
1) Open Task Manager by pressing simultaneously.
2) End task on P3BTRV.
3) Open Task Manager again and end task on W32MKDE.
4) Open P3.
5) If the error still occurs, reboot the computer.
On WIN NT/2000/XP:
1) Go to Task Manager by pressing simultaneously and selecting Task Manager.
2) Go to the Processes tab.
3) End Process on W32MKDE.EXE and NTVDM.EXE
4) Open P3.
5) If the error still occurs, reboot the computer.
- 0ADA D ·Hi Guys,
I have installed Pervasive drivers on one of my colleague’s laptop yesterday, and after that it is giving following two errors:
ERROR # 1:
Software Security Error: CLOCK CHANGED – REBOOT TO ACTIVATE TIME LICENSE (-21)”
ERROR # 2:
A Serial Number could not be locked
I have uninstalled Pervasive ODBC Drivers and also, uninstalled Primavera 3.1 from my computer, but after uninstallation it says:
Unable to delete registry value ’HKEY_CLASSES_ROOT\.prd\.prd’.
Unable to delete registry value ’HKEY_CLASSES_ROOT\.prd\shell\open\command\command’.
Unable to delete registry value ’HKEY_CLASSES_ROOT\.pmt\.pmt’.
Unable to delete registry value ’HKEY_CLASSES_ROOT\.wmf\PRMMeta’.
I have deleted these registry values and re-installed Primavera 3.1. But, to of no use. It is still giving the same above two errors of Clock Changed. What am I supposed to do?
I have tried Solution ID: 200292316242 but it is of no use.
What I might have done wrong is at the time of pervasive drivers installation, I have clicked YES when asked for "To use ODBC Interface as a client for a remote scalable SQL or Btrieve server engine" and also clicked YES when asked for "To use ODBC Interface as a client for a local scalable SQL or btrieve server engine"
After that I have uninstalled these drivers and then reinstalled them and clicked on NO buttons. But, it is giving same error.
Any Help please!!!
Rav - 0RDRafael Davila ·With any of the following most probably you should be back to prior to the start of problem.
1) If you have a registry backup from a registry utility you can restore the registry.
2) If not then you can try with System Restore from Accesories/System Restore.
My experience is that a restore from a registry backup from a utility is more efficient than XP System Restore.
Before adding software always remember to backup your Data and System Files and/or a Full Backup. Usually a registry restore should do it.
Database setup is very tricky, avoid messing with them unless you backup and know what the software is doing to your system. This is the main reason I am against P6 as a solution for those not in need of entreprise Stuff.
- 0RDRafael Davila ·The first thing occurs to me is uninstall again P3 and relocate projects folder in order to force the installation to create the folder again in the hope this will have an effect in the registry settings for the database. Then get back the project files to the directory they belong.
If this does not work then will have to figure out which registry entries must be corrected.
To do a registry restore I know of two ways. The first one is using XP System Restore, this is not as good as using a restore from other utility such as, Registry Mechanic, RegCure, Regisry Booster, Wise Registry Cleaner Pro. For these to work you must first regularly backup your registry within the utility. Therefore I suppose this is not what is going to solve your issue.
XP System Restore From:
http://support.microsoft.com/kb/322756
Windows XP
1.Click Start, click Run, type %SystemRoot%\System32\Restore\Rstrui.exe, and then click OK.
2.On the Welcome to System Restore page, click Restore my computer to an earlier time (if it is not already selected), and then click Next .
3.On the Select a Restore Point page, click the system checkpoint. In the On this list select the restore point area, click an entry that is named "Guided Help (Registry Backup)," and then click Next. If a System Restore message appears that lists configuration changes that System Restore will make, click OK.
4.On the Confirm Restore Point Selection page, click Next. System Restore restores the previous Windows XP configuration and then restarts the computer.
5.Log on to the computer. When the System Restore confirmation page appears, click OK
I understand you as I just experienced your problems with the drivers but had a registry backup. It blocked not only P3 but also Suretrak.
- 0RDRafael Davila ·Raviraj,
Take a look back to my edited previos posting. Seems like the key to restore the registry using XP Sytem restore is by going to Checkpoints. These you can create manually or at times will be auto created.
I did solve my issue with a registry restore, not using XP Sytem restore but a registry restore anyway.
Good luck,
Rafael
For other ways to backup and restore your registry:
http://www.larshederer.homepage.t-online.de/erunt/
or
http://free-backup.info/how-to-make-a-backup-of-your-registry-using-regedit.html
&
http://www.theeldergeek.com/windows_xp_registry.htm - 0RDRafael Davila ·Ravirah,
Remember prior to anything make your backups:
1)Registry backup in your computer. The free utility on the following link I just learned seem a good way.
http://www.larshederer.homepage.t-online.de/erunt/
2)A Checkpoint: All programs>accessories>system tools>system restore>create restore point
3)A full computer backup in a separate hard disk.
In case of emergency try going back to your original position in the order spelled out before. First try to restore your registry from a registry backup, it worked for me. Next you can try a restore from the System Restore using last Checkpoint. Always in case of disaster a full system backup is handy even in case you won’t restore from this you might be in need of some data not stored in My Documents Folder, this ensure you got everything backed up.
Hoping to hear good news from you early next week,
Rafael
- 0ADA D ·Hi Hemanth,
I haven’t tried anything yet. It was on my colleagues laptop and P3 is still locked. On my company laptop P3 is still working fine and so, not in a hurry.
I was busy last week, but this weekend I will try what rafael has said or else i will go to the service centre guys. Dont think of formatting so soon.
All the best
- 0RDRafael Davila ·Because a registry restore worked for me I suspect the issue is not necessarily in missing system files but in the registry.
I/We had an issue on licensing, if we have a standalone installation or a single license you cannot have two connections at the same time.
Perhaps our problem started just after setting up a connection to the database that is locking your database files and does not allows anyone else to access the database, being a single license installation. What if we created a permanent connection that is not unlocked automatically?
To delete the connection that might be causing the problem go to Control Panel, click Administrative Tools and then click Data Sources (ODBC). Under User DSN tab you should have the original Btrieve Connection, it should read something like P3 under user name and PB Intersolv …Btrieve under Driver, leave these as is. Look for the connection that was created by the Pervasive Software, under name can be any you assigned during your setup, under driver it should read Pervasive Software OBDC-32, finally delete this User Data Source.
Assuming your original P3 data source is still intact try connecting using P3 or SureTrak, if not try reinstalling either P3 or SureTrak so your P3 User Data Source is restored.
Consult your EDP people to see if this makes sense to them.
Best regards,
Rafael
- 0HKHemanth Kumar ·thanks Rafael for your time
but
i dont have any said connection in the user DSN
......................
I can install SURETRAK3
but does not runs
it says
"Unable to find a serial number .Please make sure that the files in the Program or work directory,as specified in the registry,are not marked READ-ONLY"
-----------------------
IT guys told me to reinstall XP service pack 3
done .........but no change
-------------------------------------
P6 works fine
- 0RDRafael Davila ·All issues are with Btrieve, P6 uses another Database. I did not have to re-install SP-3 a registry restore was all I needed. Tell your EDP people, show this communication to them.
The last thing occurs to me is reinstalling the drivers in the hope for you to see again your connection and be able to delete it so the registry values are reset to unlock the database.
Wow this is though, databases are tricky. Whatever you decide to do make a full backup.
Talk to you tomorrow, here is late in the evening.
Best regards
Rafael - 0RDRafael Davila ·Hemanth
There is a utility that completely removes ODBC drivers from Windows XP called XPlite.
REPAIR!
More than a powerful configuration utility - XPlite give you amazing control to repair Windows as well. If a particular technology gives you trouble you can completely remove it, and then reinstall it as cleanly as the day Windows was first installed on your computer.
http://www.litepc.com/
http://www.litepc.com/xplite/oscomptop.htm
http://www.litepc.com/xplite/odbc.htm
When running XPlite it will show all windows components installed with a checkmark under the tab Add/Remove Components. If you want to completely remove your ODBC drivers expand Operating System Options and uncheck ODBC Database drivers. XPlite sets a system restore point before adding or removing features to guarantee you can ’roll-back’ changes.
Reinstall Service Pack 3, P3 and Suretrak and hope for the best. Maybe MS Access and Excel will require running a repair as to restore their ODBC drives. Anyway anything is better than reformatting your hard disk and restoring all drivers, software, settings and user data.
Because I solved my issue I have not tried this option, if your EDP people find there is nothing to lose, then in such case you might give it a try.
Hemanth you can e-mail me an empty e-mail to rafael.davila@onelinkpr.net so I can send you back some links that might be of interest to you regarding this utility. You will need the pro version, the tral version will not remove ODBC.
I am 8 hours earlier than you, not much of a window to be online at the same time.
http://www.timeanddate.com/worldclock/full.html?sort=1
Best regards,
Rafael
- 0ABAboo Backer ·Hi
am in planning for about 1 yr
i have done programms in MSP & Primavera
Now am working in a site as an assitant planning engineer
i used to update and schedule d programm
can i any body send me a sample resume of asst. planning engineer so that i can upgrade my CV.
Pls mail it to my id aboobacker1985@yahoo.co.in or @hotmail.com - 0ADA D ·Rafael,
Registry removal or anything whatever we have discussed, is not at all required.
Refer to Post # 13 by Daya,
Even if u have uninstalled P3, then also u can resolve this issue within no time.
Reinstall pervasive drivers with isntructions as given by Daya and then re-install P3.
Absolutely no problem
Cheers,
Ravi