Skip to content

Primavera P3 Book

Chris VincentMember for 22 years 5 months
Created
1
2
0
Can anyone tell me if they have read this book? "Construction Scheduling with Primavera Project Planner - Leslie Feigenbaum" If anyone has it or has read it can they tell me the following: 1. Is it a good book for someone like myself, who is trying to resurrect his knowledge of P3 2. Does it cover the export and import of information from P3 3. Any other comments gratefully received

1 reply

Oldest first
  1. 0
    Ronald Winter ·
    I published a 2-page review of this book in the October 2003 edition of Cost Engineering, the journal for the AACEi (Volume 45/ No. 10) with an accompanying 3-page article on the merits of the CPM algorithm used by the author.

    In short,

    (1) It is a good and understandable book. It shows how to compute the CPM in a different manner than P3 (or the AACEi) uses but it still gets the job done.

    (2) Import and export comprise 12 pages of this 340-page textbook (3/4 of that is pictures showing how it is done.)

    Good luck!

    Ron Winter, PSP

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?