Skip to content

P3 Service Pack 3

Ronald WinterMember for 23 years 9 months
Created
0
2
0
Here is a notice to all P3 users: Service Pack 3 is out and available from Primavera Inc., if you have a current service agreement. The download is 5 MB long.

P3 SP3 FIXES FOR KNOWN ISSUES
-----------------------------
The following known issues in P3 3.1 have been fixed in Service Pack 3:
1. Wrong relationship when you draw a relationship with the pitchfork
after renumbering an activity ID.
2. Saving a Global change with temporary variables that access WBS
changes the Temp variable name to have periods.
3. Inconsistency between resource tabular report and profile.
4. Changing activity ID to an ID that already exists moves the
relationships.
5. Insert resource assignment multiplies the Budgeted Quantity by 100.
6. Resource loading report incorrectly spreading designated resources
after storing period performance.
7. BCWS calculation is inconsistent between spreads and columns/reports.
8. Printing to a PDF file errors.

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?