Can not start ot setup P3 after install ODBC?
In the Open Standard
Wassem HabboubMember for 21 years 2 months
- Created
- 4
- 3
0
Dear All
Can any one help me please
I load the Pervasive ODBC driver on my computer
after that i cant start P3 and have massage "A serial
number could not be locked "
i try to uninstall Pervasive ODBC driver but the probem still valid.
i try to uninstall P3 and reinstall but i have error
massage " P3 Setup
Error: (20) Record manager inactive"
please help me.
Thanks
Can any one help me please
I load the Pervasive ODBC driver on my computer
after that i cant start P3 and have massage "A serial
number could not be locked "
i try to uninstall Pervasive ODBC driver but the probem still valid.
i try to uninstall P3 and reinstall but i have error
massage " P3 Setup
Error: (20) Record manager inactive"
please help me.
Thanks
4 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?