Primavera Layouts
In the Open Standard
Swapna BoinpallyMember for 19 years 3 months
- Created
- 8
- 2
0
I created multiple layouts on a schedule. Each of these layouts relates to the critcal path as traced by going backwards on a few select activities individually. However while the layouts show up on the laptop where they were created, they do not show up when I access them from other laptops.(ie, the selected activities right at the end shows up but not the critical path that was traced)
Has anybody encountered a similar problem? As far as I know the settings are all the same.(including deselecting the filter option)
Thanks
Has anybody encountered a similar problem? As far as I know the settings are all the same.(including deselecting the filter option)
Thanks
8 replies
Oldest firstLog in or join to reply