Skip to content

P6 installation help

Ananda VijayanMember for 18 years 5 months
Created
2
2
0
Dear friends,

Currently i am using P5 with windows XP(SQL server 2000). Now i want to upgrade P6. But I have problem with P6 installation.

1. Runing SQL server 2005 setup, SQL server database services menu showing the following error. "SQL server setup cannot perform the upgrade because the component is not installed on the computer. To proceed, verify that the component to be upgraded is currently installed, and that the component to be upgraded is specified in the ADDLOCAL property. For more information, see running setup from the command prompt in SQL Server Books online."

2. After completion of the P6 setup, the following error appear, " Bad Public user name & password. Database server error, SQL network/Interfaces. Error locating server / Instance specified. (XFFFFFFF)"

Kindly help in the above matter.

Thanks in advance,

best regards,

VJ

2 replies

Oldest first
  1. 0
    Mustafa Ismayilzada ·
    Hi everybody,

    Please, give the answer to these questions if you can. I’ve got exatly same problem.

    Need your help.

    Thanks in advance.

    Mustafa
  2. 0
    Arnold Puy ·
    Mustafa,

    Check this forum:

    http://www.planningplanet.com/forum/forum_post.asp?fid=1&Cat=8&Top=46172


    Regards,

    Arnold

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?