There is a Primavera Concentric Manual. I had a paper version a long time ago and I can not find in my garage, I probably slung it, and I cannot find my electronic version either.
Maybe you can download it from the Primavera Knowledgebase if you are in maintenance, or someone else may have it hidden away some where.
You are able to make SureTrak user log in by deleting SureTrak as a user in the P3 file Access area then the SureTrak user has to log in before opening the file.
Paul E Harris
Eastwood Harris Pty Ltd, Melbourne, Australia
Planning and Scheduling Training Manual & Book Publishers, Consulting and Training
www.eh.com.au