I need your help

Jason LIMember for 18 years 9 months
Created
2
4
0
Dear all,
I need your help,if you have basic design schedule and detail design schedule, like chemical or oil refinery etc. Please kindly send to my personal email box: li2905492@hotmail.com.
Many thanks.

2 replies

Oldest first
  1. 0
    Samer Zawaydeh ·
    Dear Jack,

    It would be much more benefitial if you get a copy of your contract documents and especially the BOQ and sit with your Project Team and start building you Program of Works.

    With kind regards,

    Samer
  2. 0
    Rafael Davila ·
    Usually design schedules if outsourced are based on contract milestones for design phases such as Conceptual Design, Preliminary Design, 60%, 90% & 100%, details might vary. But if you do in-house design then you got to get into the details. I am from the civil contracting business but at very few times we end up doing some works at pharmaceuticals, chemical or for the couple of petro at the island. I know some mechanical estimators use Gulf Publishing Books as a reference. The following might provide you some help or at least a link where to search for more appropriate references.

    http://www.gulfpub.com/product.asp?PositionID=cart&ProductID=2706&Catalog=GPS&results_per_page=10&search=plant design&SearchTypeID=&SearchInterestID=&PageMove=3

    http://yirfan.blogspot.com/2009/01/yim318-conceptual-cost-estimating.html

    Best regards,
    Rafael