P3 & Adobe Acrobat V7

Mal LeadbetterMember for 25 years 1 month
Created
6
1
0
Sure someone has had this issue!

Have just had laptop changed. Previously no problems printing from P3 to acrobat to create a PDF.

Now I can’t - dont you just love computers!

Anyway I am using P3.1, Adobe Version 7 on a Windows 2000 platform. The only difference from before I can think of is the verion of Adobe, was previously V5 or V6

Help !

6 replies

Oldest first
  1. 0
    Rafael Davila ·
    http://www.planningplanet.com/forum/forum_post.asp?fid=&Cat=2&Top=64528

    Try setting Adobe Printer as your default printer, remember to set your printer settings and restart P3. Let us know.

    This is a must do for me in order to run Report Series in SureTrak .

    Best regards,
    Rafael
  2. 0
    Mal Leadbetter ·
    Thanks for the quick responce

    No joy with this solution

    Cheers
  3. 0
    Rafael Davila ·
    No surprise at all.

    From

    http://support.primavera.com/supnews.nsf/2d64d51e13e53ea6852568820057c01a/8d48df9b1146719585256a73007162ca?OpenDocument#Article%203

    P3 3.1 PRINTING ISSUES ON MICROSOFT WINDOWS 2000

    Issue #1
    When you select File, Print or try to print from within Print Preview on a Windows 2000 machine, the following error message appears: "Printer error: General error..". As a workaround, use the Print icon in the Layout to print successfully (without the error message).

    Issue #2
    When you select File, Print Setup and try to change to a different printer, P3 3.0 and P3 3.1 do not keep the setting. As a workaround, choose File, Print Setup and select the specific printer. Then, check the "Make Default" checkbox.

    Issue #3
    When printing to Adobe PDF writer version 4.05 on Windows 2000, an error is generated. As a workaround, bypass the Save As dialog box. Adobe’s Web site explains how to bypass the Save As dialog box http://ocpf.net/devnotes/skip_adobe_dialog.pdf
    Note the above site reference is different to the one given by Primavera Support.

    Hope this helps,
    Rafael
  4. 0
    Jose Frade ·
    Hi Mal,

    Long time ago I had a similar problem.P3.1 was not working with Acrobat, particularly whan I had some logo in P3 - it was bloking and not printing.

    I cannot remember clearly the steps made towards solution but I changed some settings regarding the acrobat printer but in the printer properties mode in Windows. I thing I changed the order to start printing the document (start printing with last in spool). May be not a big help but I do not remember exactly due as I said long time ago.

    BR
    JMFrade
  5. 0
    Mal Leadbetter ·
    Thanks all for the responces. Gave me a couple of idea’s.
    Anyway have found a convoluted work around. It’s a royal pain in the arse but here it is

    1 - Set default printer to Adobe PDF
    2 - Start P3
    3 - Open P3 Project file & view you want to print
    4 - Print Preview
    5 - Click Print Icon in Print Preview
    Select Print to file
    Click Print (this opens Print to file dialogue box)
    6 - Name file
    ie viewxx.prn (note I could change file extension)
    select folder location for file to saved to
    Click
    You may get a General Print Error at this stage. Just go back and repeat Steps 4 to 6. This worked for me
    7 - Go to location where file saved to.
    8 - Find file and all the follwoing options worked for me
    Double click file - opens it in Adobe
    Right mouse click on file
    Either
    Convert to Adobe PDF
    Open with Adobe PDF
    9 - File should open in Adobe DONT FORGET TO SAVE AS PDF.

    As I said a pain in the arse, but it worked. Saved me a day going into a company office, getting IT dept to look at issue etc etc etc

    Regards
  6. 0
    Rafael Davila ·
    Too much trouble, the arse got to be hurting.

    Another option can be to try using Free Primo PDF.

    http://www.primopdf.com/

    Free Primo PDF works very well within some software but has issues when printing a workbook with many spreadsheets. If it has no problem with P3 and your windows version then you can use Acrobat to edit, group and add your bookmarks.

    Nitro PDF in the other hand I never liked it, if you try it and decide to uninstall it will leave traces in the menu files of other software such as Excel and Word.

    By the way, using Adobe if you select smallest file size option you can get a compression ratios of over 30 in your photo albums without noticing quality reduction. I make my photo albums inserting the photos into Word or Power Point. Good for e-mailing photos, 30MB is not the same as 1MB, extract the photos from you PDF and you will get them back to the original size.

    Another trick I often use is to remove PDF protection using PDF Password Remover, because it does not search for the password and just wipe it out it is fast and never fails, got 100% success. Useful if you download PDF files from the internet.

    Best regards,
    Rafael

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?