Resurce loading in Primavera Project Planner v3.1
In the Open Standard
Raul SantosMember for 16 years 11 months
- Created
- 1
- 2
0
What "resources" do you load in an Engineering, Procurement and Construction Level 3 Schedule? (for each one of those phases)
Where do you get that information from? (the "resources")
How do you "load" those resources in P3?
Once you have "loaded" those resources in your schedule, what is the output that you should generate? (what reports?)
Where do you get that information from? (the "resources")
How do you "load" those resources in P3?
Once you have "loaded" those resources in your schedule, what is the output that you should generate? (what reports?)