Project Control Manual

Andrew NgMember for 22 years 4 months
Created
2
27
0
Hi All,

Would anyone be interested to search and find more link with PDF files of Project Control Manuals with guidelines and procedures on the establishment of project performance and monitoring measures on project using e.g. Earned Value Method etc.

Found two so far, for those who wish to download.

it.sns.ornl.gov/project_controls/pcmanualNov02.pdf

www.sns.gov/doe_reviews/may06rev/reference_docs/ project_control_manual/_proj_cntrl_manual.pdf

There are some rather useful measures and features found in these American examples.

Would be useful to get some samples from UK, Australia or elsewhere in the world

Andrew Ng
Contract Consultant
Queensland, Australia

2 replies

Oldest first
  1. 0
    Marcio Sampaio ·
    Thanks Andrew,

    Very good material, it will be very usefull.

    Kind regards.

    Marcio Eduardo.
  2. 0
    Andrew Ng ·
    Dont thank me, thank the organisation and authors there.

    I found it extremely useful and hope many other gain inspirations from them.