Abu Dhabi police foil $42bn bank robbery
In the Open Standard
SZ
Samer ZawaydehMember for 18 years 2 months
- Created
- 21
- 3
0
...
An extraordinary bank robbery came to light on Sunday when Abu Dhabi police revealed attempts to swindle AED153.9billion ($42 billion) from the UAE Central Bank.
... I thought this is something worth reading about. Possibly one of the biggest robberies in history. How to guard your project against colossal events? Their procedures worked obviously.
http://www.arabianbusiness.com/562408-abu-dhabi-police-foil-42bn-bank-robbery
With best regards,
Samer
An extraordinary bank robbery came to light on Sunday when Abu Dhabi police revealed attempts to swindle AED153.9billion ($42 billion) from the UAE Central Bank.
... I thought this is something worth reading about. Possibly one of the biggest robberies in history. How to guard your project against colossal events? Their procedures worked obviously.
http://www.arabianbusiness.com/562408-abu-dhabi-police-foil-42bn-bank-robbery
With best regards,
Samer
21 replies
Oldest first- 0GBGordon Blair ·That’s a fair point, with some media outlets you have to be very careful, a good rule of thumb is that:
25% of the data will be accurate
28% of the data will be erroneous due to exaggeration by well meaning but over enthusiastic reporters
18% of the data will be erroneous due to preconceptions of the editorial team
23% of the data will be erroneous through being bent to match the agenda of the media ownership, and
19% of the data will be erroneous purely due to bad maths. - 0MTMike Testro ·Hi All
This just proves that there are four types of planners.
1. Those who can add up.
2. Those who can’t add up.
3. Those who can’t be bothered.
By the way - for those of you who have a mathematical bent here is a particular question - a special accolade for whoever gives the first correct answer:
What is the square root of the number 9?
Best regards
Mike Testro - 0MTMike Testro ·Hi Samer
Everybody loves a smart arse.
By the way Bob Hope’s definition of a smart arse was a boy who could sit on an ice cream and tell you the flavour.
Here are two more to test you:
What mathematical rule has been known to exist for about 400 years but has not yet been proven? (not PI)
What matematical rule is known to be impossible - but has a symbol to represent it when required in equations.
Any from you?
Best regards
Mike Testro. - 0SZSamer Zawaydeh ·Dear Mike,
I came across this definition that I thought you might find interesting:
http://en.wikipedia.org/wiki/Postulates
The word "axiom" comes from the Greek word ἀξίωμα (axioma), a verbal noun from the verb ἀξιόειν (axioein), meaning "to deem worthy", but also "to require", which in turn comes from ἄξιος (axios), meaning "being in balance", and hence "having (the same) value (as)", "worthy", "proper". Among the ancient Greek philosophers an axiom was a claim which could be seen to be true without any need for proof.
Maybe one time, a case will come your way and you tell its Owner that he has an Axiom.
Have a nice evening.
Samer - 0MTMike Testro ·Hi Rafael
You have had long enough.
What mathematical rule has been known to exist for about 400 years but has not yet been proven? (not PI)
The four colour rule - used by cartographers who only need four colours to fill in the zones on any map and not have two of the same colour on any adjacent line.
What matematical rule is known to be impossible - but has a symbol to represent it when required in equations.
Any equation that requires the use of a square root of a minus number - I think the symbol is ~n.
Any more out there - for instance who knows what a googol number is? Or for that matter a googolplex? My 13 year old Grandson does.
Best regards
Mike Testro
- 0MTMike Testro ·Hi Rafael
Our threads crossed in the post - so we are going on to words now rather than numbers.
I never trust anything from wikipedia but their definition of Axiom seems plausible.
I have never used it but it seems to be the equivalent of the phrase "Is that a Given?" which is used by pseudo philosophers to stop a profound declamation in it’s tracks.
A lot of lovely words come from Greek roots - so what is the plural of hippopotomas?
Best regards
Mike Testro. - 0MTMike Testro ·Hi Rafael
Hippopotomas is a greek word meaning horse (hippo) of the river(potomas)
Hippopotami is a latin plural form bolted onto a greek word and is linguistically absurd.
I used to think the greek plural would be hippopotomodes unitl a greek scholar told me that was horse of the rivers - again a nonsense.
The plural of hippo (horse)is - apparently hoi hippoi so the true plural would be hoi hippoi potomas.
You may have gathered from all this that I have a sort of septic tank brain - after a while most things will rise to the surface.
Best regards
Mike Testro - 0SZSamer Zawaydeh ·Dear Mike,
Google meaning is known to many, by in any event, this is the official meaning:
Why is Google Called Google?
Googol is the mathematical term for a 1 followed by 100 zeros. The term was coined by Milton Sirotta, nephew of American mathematician Edward Kasner, and was popularized in the book, “Mathematics and the Imagination” by Kasner and James Newman. Google’s play on the term reflects the company’s mission to organize the immense amount of information available on the web.”
Have a nice weekend.
Samer - 0SZSamer Zawaydeh ·Dear Mike,
Thank you for the question. This added new terminology for me and led to the discovery of an even larger number:
Googolplex
From Wikipedia, the free encyclopedia
This article is about the number. For the headquarters of Google Inc., see Googleplex. For other uses, see googol (disambiguation).
A googolplex is the number 10googol, which can also be written as the number 1 followed by a googol of zeros (i.e. 10100 zeros).
1 googolplex
= 10googol
= 10(10100)
= 1010000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000
History
In 1938, Edward Kasner’s nine-year-old nephew Milton Sirotta coined the term googol; Milton then proposed the further term googolplex to be "one, followed by writing zeroes until you get tired". Kasner decided to adopt a more formal definition "because different people get tired at different times and it would never do to have [boxing champion] Carnera be a better mathematician than Dr. Einstein, simply because he had more endurance and could write for longer.".
The time it would take to write such a number also renders the task implausible: if a person can write two digits per second, it would take around about 1.51 × 1092 years, which is 1.1 × 1082 times the age of the universe, to write a googolplex.
The even larger number is:
Even larger still is the "googol multiplex", which was defined by Paul Doyle (University of Maryland, College Park, 1981), using Knuth’s up-arrow notation as , where "Gp" = a googolplex
Now we know what they call the largest number possible.
Thank you again for the information.
With kind regards,
Samer - 0MTMike Testro ·Hi Samer
I never believe a thing I read in Wikipedia.
An interesting coincidence is that my 13 year old Grandson is a James Newman and his defition of the biggest number possible is - infinty +1.
He also says that infinity +2 is a nonsense as you can’t get bigger than the biggest possible number.
Who am I to argue?
Best regards
Mike Testro
Log in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?