What is conceptual design, DBM, EDS, FEED?
In the Open Standard
Miguel RiosMember for 17 years
- Created
- 2
- 1
0
Hello guys:
Could you please clarify me the following concepts:
- Conceptual design
- DBM (Design Basis Memoranda)
- EDS (Engineering Design Specifications)
- FEED (Front End Engineering Design)
What do you develop in each one?
What is the sequence? (Which is first, which is second, which one is last?). Can any of them be developed in parallel?
Are any of these concepts basic or detaled engineering?
Could you please clarify me the following concepts:
- Conceptual design
- DBM (Design Basis Memoranda)
- EDS (Engineering Design Specifications)
- FEED (Front End Engineering Design)
What do you develop in each one?
What is the sequence? (Which is first, which is second, which one is last?). Can any of them be developed in parallel?
Are any of these concepts basic or detaled engineering?
2 replies
Oldest firstLog in or join to reply