Rates for Pipeline Welding/ Installation

Emmanuel UdoMember for 22 years 8 months
Created
4
4
0
Does any one have, or know where I can obtain, rule of thumb (rates) for pipeline welding/ installation? I would appreciate any such information.
Thank you in advance

Emmanuel

4 replies

Oldest first
  1. 0
    Samer Zawaydeh ·
    Dear Emmanuel,

    This usually depends on the type of material, thickness, position, environment and other factors.

    You can see a lot of discussion in the same forum under the title "Pipe Welding duration"

    http://www.planningplanet.com/forum/forum_post.asp?fid=1&Cat=5&Top=58099

    With kind regards,

    Samer
  2. 0
    A D ·
    Hi Emmy,

    You can refer to this great book for planners on pipeline installation

    http://www.amazon.com/Estimators-Piping-Man-Hour-Manual-Library/dp/0884152596/ref=pd_bxgy_b_text_b

    Estimator’s Piping Man-Hour Manual, Author: John Page

  3. 0
    Mark McElhaney ·

    Hey Emmanuel, I can suggest

    Hey Emmanuel, I can suggest you something valuable pertaining to your queries for pipe welding installation. You can PM me if you like. I've studied at a prestigious welding school here in the U.S. You can check if you want to know more about welding.

  4. 0
    Bernard Ertl ·

    Emmanual's original query was

    Emmanual's original query was posted over 3 years ago, but for anyone interested in the same question, eTaskMaker has a dynamic estimating module for piping demolition, fabrication and field installation which considers all the major factors including metallurgy, diameter, thickness, etc.