PRA 8.7.6 Update available now as a patch.
- Created
- 0
- 3
Beginning with Primavera Risk Analysis 8.7 Service Pack 6 (8.7.0060), new versions of the software will be available to download as patches. Previously, new versions were available to download from the Oracle eDelivery site. To locate the most current version of Primavera Risk Analysis:
1. Select the "Patches & Updates" tab.
2. In the "Patch Search" window, select the "Product or Family (Advanced)" option.
3. Select "Primavera Risk Analysis" as the Product, and "Risk Analysis 8.7" as the Release.
4. Perform search and the most current version will be returned.
I'm downloading this now. Thought you should know. This was news to me.