Skip to content

This job expired 1 month ago and is kept for reference.

Contract Employment

Project Cost / Risk Controllers and Managers

UK-South West (Region)

Posted by PP Admin · 1 views

Job type
Contract Employment
Industry
Civil / Building / E&M
Region
UK-South West (Region)
Salary
£450–£650/day
Closing date
22 Aug 2026

Don’t panic.  Control it.  Most projects do not lose control because nobody reported the issue.  They lose control because nobody challenged it early enough.

I’m looking for cost, risk and project controls people who can spot exposure before the report catches up.

I’m recruiting for several long-term roles on a confidential major industrial delivery programme in South Wales.

This is a live, site-led project controls environment where cost movement, risk exposure, change visibility and forecast confidence need to be understood early — not explained after the damage is done.

Current requirements:

Project Cost Controllers
3–4 roles | £400–£500/day

Project Risk Controllers / Risk Analysts
2 roles | £400–£550/day

Lead Cost & Risk Manager
1 role | £550–£650/day

*Room for negotiation up for the right people* 

Inside IR35
Long-term contract opportunities
Permanent packages considered where staff is the better route
South Wales-based
Site-led environment, with flexibility depending on role level and project rhythm

Some roles are pure reporting.  These are not.

The best fit will be someone who understands:

- why cost is moving
- whether the forecast is believable
- where change is starting to bite
- what risk is actually owned
- how cost, schedule and commercial position connect
- what needs escalating before it becomes expensive

I’m especially interested in people who have worked close to live project delivery — not just central PMO reporting.

Relevant backgrounds could include:

- Major projects
- Industrial programmes
- Energy
- Utilities
- Infrastructure
- Manufacturing
- Process plant
- Heavy engineering
- Construction
- Project controls consultancy

This will not suit someone looking for a fully remote reporting-only role.

It will suit people who want to help turn project information into control decisions.

If this sounds like you, comment or message:

“South Wales Controls”

I’ll come back to you directly.

Similar jobs

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent EmploymentCivil / Building / E&M
    £120,000