This job expired 15 years ago and is kept for reference.
Planning Engineer - Libya
Professional Management Resources (PMR) · Libya (AF.LY)
Posted by Denise Mason · 1 views
- Job type
- Permanent Employment
- Industry
- Water / Utilities
- Region
- Libya (AF.LY)
- Salary
- Negotiable, local tax free, all found.
- Closing date
- 4 Nov 2010
Our client is UK based company in JV with Libyan company engaged in the Great Man Made River Project which comprises some 393 Km of 4m diameter prestressed water concrete pipeline and associated infrastructure. They require a Planning Engineer to work directly with the Contractor for the construction of three large pump stations in Kufra. The position will be based in Benghazi with frequent travel to site. Candidates should be very familiar with Primavera 3 and preferably also be a HND/Degree qualified Civil or Mechanical Engineer with extensive construction experience, fully understanding the construction sequence and process and capable of developing the plan and timetable on which the project will be built. Our client is offering negotiable local tax free salary, all found. Leave is 73 days per year in four rotations with air tickets provided.
Our client is UK based company in JV with Libyan company engaged in the Great Man Made River Project which comprises some 393 Km of 4m diameter prestressed water concrete pipeline and associated infrastructure. They require a Planning Engineer to work directly with the Contractor for the construction of three large pump stations in Kufra. The position will be based in Benghazi with frequent travel to site. Candidates should be very familiar with Primavera 3 and preferably also be a HND/Degree qualified Civil or Mechanical Engineer with extensive construction experience, fully understanding the construction sequence and process and capable of developing the plan and timetable on which the project will be built. Our client is offering negotiable local tax free salary, all found. Leave is 73 days per year in four rotations with air tickets provided. Applicants please kindly forward your resume/CV directly to agency by email: info@pmr-worldjobs.co.uk