Skip to content

This job expired 15 years ago and is kept for reference.

Permanent Employment

P6 Schedule Systems Support

Project Programme Management Limited · Ireland (EU.IE)

Posted by Matthew Edwards · 1 views

Job type
Permanent Employment
Industry
IT Engineering Projects
Region
Ireland (EU.IE)
Salary
TBA
Closing date
11 Jan 2011

P6 Schedule Systems Support

Scope / Role Description

Primary responsibility of the Schedule Systems Support Position is to provide support to the CSC Project Team for developing the following systems:

  • Automated Weekly Schedule Reporting
  • Integration of Site Schedules using MS Access
  • Support Database development and Integration with other existing site systems
  • Proven record of delivering quality ASP.Net solutions as may be required both to support existing systems and/or develop new solutions
  • Develop Database driven websites

Qualifications & Skills

A BS degree Engineering / Computing is preferred along with five plus years experience in schedule systems development.

An in depth knowledge of Database Set up and Management is a must in order to provide integration of Primavera data with MS Access and MS SQL Server dB environments.

5 years+ experience of Web application development using ASP.Net and Business Analysis and Work flow design and User Interface design is a requirement all within a scheduling / construction team environment.

A demonstrated ability to translate scope requirements into a working system to support the project is required.

MS Sharepoint Services experience an advantage.

This position requires a good knowledge of Primavera and other scheduling software. Candidate must have proficiency in a windows based environment and software (Word, PowerPoint, Project, advanced MS Excel and MS Access)